USS Triton (SSRN/SSN-586), the only member of her class, was a nuclear-powered radar picket submarine in the United States Navy. She was the only Western submarine powered by two nuclear reactors. Triton was the second submarine and the fourth vessel of the United States Navy (USN) to be named for the Greek god Triton. This naming convention was unusual at the time; USN submarines were usually named for various species of fish. At the time of her commissioning in 1959, Triton was the largest, most powerful, and most expensive submarine ever built at $109 million (equivalent to $1.2 billion in 2025) excluding the cost of nuclear fuel and reactors.
Triton's shakedown cruise in early 1960 saw her become the first vessel to execute a submerged circumnavigation of the Earth in Operation Sandblast. The voyage was made under the command of Captain Edward L. "Ned" Beach Jr. Triton's mission as a radar picket submarine was made obsolete after two years by the introduction of the carrier-based Grumman WF-2 Tracer airborne early warning aircraft. She was converted to an attack submarine in 1962 and became the flagship for the Commander, Submarine Forces, U.S. Atlantic Fleet (COMSUBLANT) in 1964. She was decommissioned in 1969, the first U.S. nuclear submarine to be taken out of service.
Triton's hull was moored at the St. Julien's Creek Annex of Norfolk Naval Shipyard in Portsmouth, Virginia, as part of the reserve fleet until 1993, though she was struck from the Naval Vessel Register in 1986. In 1993, she was towed to Puget Sound Naval Shipyard to await the Nuclear Powered Ship and Submarine Recycling Program. Triton landed on the keel resting blocks in the drydock basin on 1 October 2007 to begin this recycling process, which was completed effective 30 November 2009. Triton's sail superstructure was saved from the recycling process and is now part of the USS Triton Submarine Memorial Park located on Port of Benton Boulevard in Richland, Washington.
Triton was a first-generation U.S. nuclear-powered submarine, along with Nautilus, Seawolf, Halibut, and Skate (and her three sisters). While serving as fully operational units of the U.S. Navy, the vessels also played key developmental roles. Nautilus introduced the use of nuclear power for ship propulsion. Seawolf used a liquid-metal nuclear reactor using liquid sodium as an alternative to pressurized water as a heat-exchange medium. Halibut was the first nuclear-powered submarine to perform a strategic nuclear deterrence patrol armed with Regulus cruise missiles. The Skate-class submarines were the first nuclear-powered submarine class with more than one boat built. Triton's unique contribution to the development of nuclear power for naval propulsion was her dual-reactor plant, which provided the speed required for radar picket missions.
Radar picket submarines (Navy classification "SSR") were developed after World War II to provide intelligence information, electronic surveillance, and fighter aircraft interception control for forward-deployed naval forces. Unlike destroyers used as radar picket ships during the war, these submarines could avoid attack by submerging if detected. The USN's MIGRAINE program involved converting existing fleet submarines into radar picket vessels, and the Navy also ordered two purpose-built, diesel-electric SSRs, Sailfish and Salmon. However, these were incapable of sustaining the high submerged or surfaced speeds necessary to operate with fast carrier task forces, so were unsuitable to the task.
Nuclear power offered the only possible solution. Triton was designed in the mid-1950s as a radar picket submarine capable of operating at high speed, on the surface, in advance of an aircraft carrier task force. Triton's high speed came from her twin-reactor nuclear propulsion plant, with a designed speed, surfaced and submerged, of 28 kn (32 mph; 52 km/h). On 27 September 1959, Triton achieved "well in excess of" 30 kn (35 mph; 56 km/h) during her initial sea trials.
To meet her radar picket role, Triton's main air search radar initially used the AN/SPS-26, the USN's first electronically scanned, three-dimensional search radar, which was laboratory tested in 1953. The first set was installed on board the destroyer leader Norfolk prior to its installation on board Triton in 1959. Since it was scanned electronically in elevation, the AN/SPS-26 set did not need a separate height-finding radar. A submarine version of SPS-26, designated BPS-10, was under development, and it was slated for installation on Triton. To process her radar, electronic, and air traffic data, Triton had a combat information center (CIC) located in a separate air control compartment, situated between Triton's reactor and operations compartments.
Design work on a nuclear-powered radar picket submarine (SSRN) began in 1954–1955. As initially designed, Triton had a three-level hull, with the CIC (see image) located on the middle level. Her overall length was initially 400 feet (120 m), with a beam of 38 feet (12 m). Also, as initially designed, her displacement was 4,800 tons surfaced and 6,500 tons submerged. January 1955 performance estimates called for the submarine advanced reactor (SAR) propulsion plant to produce 34,000 shaft horsepower (25,000 kW), with a surfaced speed of 27 kn (31 mph; 50 km/h) and a submerged speed of 23 kn (26 mph; 43 km/h). Triton initially had the same dual radar system installed on the non-nuclear Sailfish-class radar picket submarines (i.e., BPS-2 search radar and BPS-3 height-finder set) housed in a large, stepped sail (see image). Construction cost was initially estimated at $78 million. Subsequent growth of the SAR propulsion plant necessitated the overall increase in Triton's length and tonnage, although without any loss in speed, while the installation of the AN/SPS-26 3D search radar allowed the elimination of a separate height-finder.
Triton was to be the lead boat of a proposed class of nuclear-powered radar picket submarines. A December 1955 long-range naval planning report envisioned five carrier strike groups, each supported by two radar picket submarines. The total force included two non-nuclear Sailfish-class submarines and eight nuclear submarines. With construction costs for Triton escalating, this long-range requirement was revised in 1957 to provide four nuclear-powered radar picket submarines for a single nuclear-powered carrier group, with the four remaining conventionally powered carrier groups supported by two diesel-electric radar picket submarines each.
At the time of her construction, Triton was the largest submarine ever built. Her knife-like bow, with its bulbous forefoot, provided improved surfaced sea-keeping for her radar picket role. Her surface sea-keeping was further enhanced by high reserve buoyancy (30%), provided by 22 ballast tanks, the most ever in an American submarine. She was the last submarine to have a conning tower, as well as the last American submarine to have twin screws or a stern torpedo room. Her sail was the largest ever aboard an American submarine, measuring 70 feet (21 m) long, 24 feet (7.3 m) tall, and 12 feet (3.7 m) wide, and designed to house the large AN/SPS-26 3D air-search radar antenna when not in use. She also had a compartment solely for crew berthing, with 96 bunks, and two separate chief petty officers' quarters. With an overall length of 447.5 feet (136.4 m), Triton was the longest submarine in the history of the USN until the nuclear-powered ballistic missile submarine USS Ohio was commissioned in 1981.
Triton was the only submarine outside of the Soviet Union designed with a two-reactor propulsion plant. Her S4G reactors were seagoing versions of the land-based S3G reactor prototype. Both reactors composed the SAR program, a joint venture between the USN, Atomic Energy Commission (AEC), and General Electric. As originally designed, Triton's total reactor output was rated at 34,000 horsepower (25,000 kW). However, Triton achieved 45,000 horsepower (34,000 kW) during her sea trials (pictured), and her first commanding officer, Captain Edward L. Beach Jr., believed Triton's plant could have reached 60,000 horsepower (45,000 kW) "had that been necessary".