Pakistan Railways

Pakistani state-owned railway company

Anúncio

Pakistan Railways is the state-owned railway operator in Pakistan. Founded in 1886 as the North Western State Railway and headquartered in Lahore, it owns 7,791 kilometres (4,841 miles) of operational track, stretching from Peshawar to Karachi, offering both freight and passenger services, covering 494 operational stations across Pakistan.

In 2014, the Ministry of Railways launched Pakistan Railways Vision 2026, which seeks to increase PR's share in Pakistan's transportation sector from 4% to 20%, using the Rs. 886.68 billion (US$3.2 billion) China–Pakistan Economic Corridor rail upgrade. The plan includes building new locomotives, development and improvement of current rail infrastructure, an increase in average train speed, improved on-time performance and expansion of passenger services. The first phase of the project was completed in 2017, and the second phase is scheduled for completion by 2021. Among them is the ML-1 project, which will be completed in three phases at a cost of Rs. 1.11 trillion (US$4.0 billion). Until October 2022, these projects have not started construction or tendering.

Pakistan Railways is an active member of the International Union of Railways. In the 2023–24 financial year, Pakistan Railways carried 42.1 million passengers and 5.7 million tonnes of freight. Currently, it is suffering from poor maintenance.

Mazhar Ali Shah is the current federal secretary and chairman for Pakistan Railways.

North-Western State Railway (1886–1905)

In 1855, during the British Raj, several railway companies began laying track and operating in Sindh and Punjab. The country's railway system was originally a patchwork of local rail lines operated by small, private companies, including the Scinde Railway, Punjab Railway, Delhi Railway and Indus Flotilla. In 1870, the four companies combined to form the Scinde, Punjab & Delhi Railway. Several other rail lines were soon built, including the Indus Valley State Railway, Punjab Northern State Railway, Sind–Sagar Railway, Sind–Pishin State Railway, Trans–Baluchistan Railway and Kandahar State Railway. These six companies merged with the Scinde, Punjab & Delhi Railway to form the North Western State Railway in 1886.

North-Western Railway (1905–1961)

The North Western State Railway was renamed as North Western Railway in 1905.

Following the partition of British India and independence of Pakistan in 1947, most of the North Western Railway infrastructure became part of the Pakistani territory. The country adopted 8,122 km (5,047 mi) of the North Western State Railway; 6,880 km (4,280 mi) was 1,676 mm (5 ft 6 in), 506 kilometres (314 mi) was 1,000 mm (3 ft 3+3⁄8 in) metre gauge, and 736 kilometres (457 mi) was 762 mm (2 ft 6 in) narrow gauge.

In 1954, a branch line was extended from the Karachi–Peshawar Railway Line to Mardan and Charsada. Two years later, the Jacobabad–Kashmore metre-gauge line was converted to 5 ft 6 in (1,676 mm) broad gauge.

Pakistan Western Railway (1961–1974)

On 1 February 1961, the North-Western Railway was renamed the Pakistan Western Railway. In East Bengal, the portion of the Assam Bengal Railway in Pakistani territory was renamed the Pakistan Eastern Railway.

The Kot Adu–Kashmore section of the Kotri–Attock Railway Line was built from 1969 to 1973, providing an alternate route from Karachi to northern Pakistan.

Pakistan Railways (1974–present)

In 1974, Pakistan Western Railways was renamed Pakistan Railways. In February 2006, the 126-kilometre (78 mi) Hyderabad–Khokhrapar Branch Line was converted to 5 ft 6 in (1,676 mm). All narrow-gauge tracks in the country were converted to broad gauge or dismantled during the 2000s. On 8 January 2016, the Lodhran–Raiwind Branch Line double-rail project was completed.

Pakistan Railways is a state-owned enterprise under the Ministry of Railways (MoR) of the government of Pakistan, tasked with and primarily responsible for planning, administering and establishing passenger rail service and regulating railway companies and industries. Pakistan Railways policy and development are administered by the ministry. From 1947 to 1959, the Pakistan Western Railway and Pakistan Eastern Railway were administered by the Railway Division of the Ministry of Communications, headed by the Director General of Railways (DG Railways) in the ministry. In 1959, an ordinance was passed by Parliament outlining the need for a semi-autonomous railway board. The board was conceived in accordance with the principal powers of the central government as stipulated in the Railways Act IX of 1890. After the first session of the third national assembly, President Muhammad Ayub Khan issued Presidential Order 33 on 9 June 1962. The order directed the transfer of control of both railways (PWR and PER) from the central government to the provincial governments of West Pakistan and East Pakistan, respectively. When PO 33 came into effect on 1 July 1962, railway boards were established by both provinces (repealing the Railway Board Ordinance of 1959).

The presidential order reinstated a separation convention that began in the fiscal year 1961–62, which kept railway finances separate from general finances and gave each board more autonomy. In 1974, the Ministry of Railways was established to handle planning, policy-making, technical advice, and management of the railway. In 1982, a presidential order merged the Ministry of Railways with the Railway Board, creating a federal ministry.

The Railway Board, in existence from 1959 to 2000, was modified with an executive committee from 2000 and 2014. The Railway Board was reconstituted on 20 February 2015. The Board members are: