The Canadian Pacific Railway (French: Chemin de fer Canadien Pacifique) (reporting marks CP, CPAA, MILW, SOO), also known simply as CPR or Canadian Pacific and formerly as CP Rail (1968–1996), is a Canadian Class I railway incorporated in 1881. The railway is owned by Canadian Pacific Kansas City Limited, known until 2023 as Canadian Pacific Railway Limited, which began operations as legal owner in a corporate restructuring in 2001.

The railway is headquartered in Calgary, Alberta. In 2023, the railway owned approximately 20,100 kilometres (12,500 mi) of track in seven provinces of Canada and into the United States, stretching from Montreal to Vancouver, and as far north as Edmonton. Its rail network also served Minneapolis–St. Paul, Milwaukee, Detroit, Chicago, and Albany, New York, in the United States.

The railway was first built between eastern Canada and British Columbia between 1875 and 1885 (connecting with Ottawa Valley and Georgian Bay area lines built earlier), fulfilling a commitment extended to British Columbia when it entered Confederation in 1871; the CPR was Canada's first transcontinental railway. Primarily a freight railway, the CPR was for decades the only practical means of long-distance passenger transport in most regions of Canada and was instrumental in the colonization and development of Western Canada. The CPR became one of the largest and most powerful companies in Canada, a position it held as late as 1975. The company acquired two American lines in 2009: the Dakota, Minnesota and Eastern Railroad (DM&E) and the Iowa, Chicago and Eastern Railroad (IC&E). The company also owns the Indiana Harbor Belt Railroad, a Hammond, Indiana-based terminal railroad along with Conrail Shared Assets Operations. CPR purchased the Kansas City Southern Railway in December 2021 for US$31 billion. On April 14, 2023, KCS became a wholly owned subsidiary of CPR, and both CPR and its subsidiaries began doing business under the name of its parent company, CPKC.

The CPR is publicly traded on both the Toronto Stock Exchange and the New York Stock Exchange under the ticker CP. Its U.S. headquarters are in Minneapolis. As of March 30, 2023, the largest shareholder of Canadian Pacific is the Royal Bank of Canada, at 5.94% of shares.

The creation of the Canadian Pacific Railway was undertaken as the National Dream by the Conservative government of John A. Macdonald, together with mining magnate Alexander Tilloch Galt. As a condition for joining Confederation, British Columbia had insisted on a transport link to the East, with the rest of the Confederation. In 1873, Macdonald, among other high-ranking politicians, bribed in the Pacific Scandal, granted contracts to the Canada Pacific Railway Company, which was unrelated to the current company, as opposed to the Inter-Ocean Railway Company, which was thought to have connections to the Northern Pacific Railway Company in the United States. In 1867, the year of Canada's Confederation, US Secretary of State William H. Seward surmised that the whole North American continent "shall be, sooner or later, within the magic circle of the American Union." After this scandal, the Conservatives were removed from power, and Alexander Mackenzie, the new Liberal prime minister, ordered construction of the railway under the supervision of the Department of Public Works.

Enabled by the CPR Act of 1874, work began in 1875 on the Lake Superior to Manitoba section of the CPR. The ceremonial sod-turning at Westfort on June 1, 1875, was prominently reported in the June 10 edition of the Toronto Globe. It noted that a crowd of "upwards of 500 ladies and gentlemen" gathered to celebrate the event on the left bank of the Kaministiquia River in the District of Thunder Bay, about four miles upriver from Fort William.

Macdonald would later return as prime minister in 1878 and adopt a more aggressive construction policy. Bonds were floated in London and called for tenders to complete sections of the railway in British Columbia. American contractor Andrew Onderdonk was selected, and his men began construction on May 15, 1880.

In October 1880, a new consortium signed a contract with the Macdonald government, agreeing to build the railway for $25 million in credit and 25 million acres (100,000 km2) of land. In addition, the government defrayed surveying costs and exempted the railway from property taxes for 20 years. Once completed in 1882 with a last spike at Feist Lake, near Vermilion Bay, Ontario, the line was turned over to the newly minted private Canadian Pacific Railway company. In 1883, the first wheat shipment from Manitoba was transported over this line to the Lakehead (Fort William and Port Arthur) on Lake Superior.

A beaver was chosen as the railway's logo in honour of Donald Smith, 1st Baron Strathcona and Mount Royal, who had risen from factor to governor of the Hudson's Bay Company over a lengthy career in the beaver fur trade.

Building the railway, 1881–1886

Building the railway took over four years. The Canadian Pacific Railway began its westward expansion from Bonfield, Ontario, where the first spike was driven into a sunken railway tie. That was the point where the Canada Central Railway (CCR) extension ended. The CCR started in Brockville and extended to Pembroke. It then followed a westward route along the Ottawa River and continued to Mattawa at the confluence of the Mattawa and Ottawa rivers. It then proceeded to Bonfield.

It was presumed that the railway would travel through the rich "fertile belt" of the North Saskatchewan River Valley and cross the Rocky Mountains via the Yellowhead Pass. However, a more southerly route across the arid Palliser's Triangle in the District of Assiniboia and via Kicking Horse Pass and down the Field Hill to the Rocky Mountain Trench was chosen.

In 1881, construction progressed at a pace too slow for the railway's officials who, in 1882, hired the renowned railway executive William Cornelius Van Horne to oversee construction. Van Horne stated that he would have 800 km (500 mi) of main line built in 1882. Floods delayed the start of the construction season, but over 672 km (418 mi) of main line, as well as sidings and branch lines, were built that year.

The Thunder Bay branch (west from Fort William) was completed in June 1882 by the Department of Railways and Canals and turned over to the company in May 1883. Construction reached Calgary in the North-West Territories' District of Alberta by August 1883, and regular service to Winnipeg, Manitoba, was established by December 1883. By the end of 1883, the railway had reached the Rocky Mountains, just 8 km (5.0 mi) east of Kicking Horse Pass. The treacherous 190 km (120 mi) of railway west of Fort William was completed by Purcell & Company, headed by "Canada's wealthiest and greatest railroad contractor," industrialist Hugh Ryan.

Many thousands of navvies worked on the railway. Many were European immigrants. An unknown number of Stoney Nakoda also assisted in track laying and construction work in the Kicking Horse Pass region. In British Columbia, government contractors eventually hired 17,000 workers from China, known as "coolies". After 2+1⁄2 months of hard labour, they could net as little as $16 ($506 in 2025 adjusted for inflation) Chinese labourers in British Columbia made only between 75¢ and $1.25 a day, paid in rice mats, and not including expenses, leaving barely anything to send home. They did the most dangerous construction jobs, such as working with explosives to clear tunnels through rock. The exact number of Chinese workers who died is unknown, but historians estimate the number is between 600 and 800.

By 1883, railway construction was progressing rapidly, but the CPR was in danger of running out of funds. In response, on January 31, 1884, the government passed the Railway Relief Bill, providing a further $22.5 million in loans to the CPR. The bill received royal assent on March 6, 1884.

In March 1885, the North-West Rebellion broke out in the District of Saskatchewan. Van Horne, in Ottawa at the time, suggested to the government that the CPR could transport troops to Qu'Appelle in the District of Assiniboia in 10 days. Some sections of track were incomplete or had not been used before, but the trip to Winnipeg was made in nine days and the rebellion quickly suppressed. Controversially, the government subsequently reorganized the CPR's debt and provided a further $5 million loan. This money was desperately needed by the CPR. Even with Van Horne's support with moving troops to Qu'Appelle, the government still delayed in giving its support to CPR, due to Macdonald pressuring George Stephen for additional benefits.